I cut and laid the tile yesterday, while Sweetheart cleaned, and purged a few rooms.
The grout was finished today, after letting the adhesive set. This week the toilet will be sat, vanity installed, and faucet put into working order.
I've had quite a list of project that are running concurrently. The doggy door has been finished except for painting the trim work. That will happen when the weather cooperates. The pantry door has been added and some tile work needs to happen in that room. The old wire racks will be installed until the funds become available for a bigger wooden shelving system. This is the room I'm most excited about...
The Klipsch speakers are tucked into the living room built-ins. This room needs painting before too much more can be completed. This will allow boxes to be unpacked, and items finally falling into place.
The boys bunk beds arrived, and of course Red Ant can now reach the ceiling fan, and pull chains. The fan is getting replaced with a low profile lighting fixture this week before a trip to the emergency room is needed.
The refrigerator
I may not be posting as often, but enjoy reading the blogs to my right. I'll post as projects or events happen. Oh yeah, a big announcement is coming Saturday, so stay tuned!!!
Keep Right On Prepping - K
The tile work looks good. Good luck with your other projects.
ReplyDeleteThanks. I always seem to be lacking one of the three: time, energy, or money.
DeleteLooks good K.... I am going to remodel the master bathroom soon and put in tile. Of course I have been saying this for 3 years now!
ReplyDeleteYeah, I completely understand. My Sweetheart would have loved to have this bathroom finished while she worked at home.
DeleteLooks good! You are very busy!
ReplyDeleteAdventures can be fun! You guys will look back and say, remember that time we had to use the tiny fridge, lol!!!!!
Lots of stuff going on in our household. How's the hubby?
Delete