Sunday, June 28, 2015

Leaps and Bounds

Man, what a great weekend. I got a lot accomplished on the list, and I think if I went for broke I could actually have the house ready by the first. I got all of the kitchen, hallway, and laundry room detail paint work done. The outside was pressure washed, and I'm sure that if pressure washers were around about the time of Hercules, it would have been one of his Labors. Also while I had Sweetheart was there, I got the refrigerator moved over to our house. It'll reside in the garage for bottled water, Gatorade, and a few beers with mugs in  the freezer.

Huge difference for curb appeal

First time since 2000 that it's been this clean.
The List:
  • Spray 10% bleach solution on roof moss to kill it. (2nd of 3 applications)
  • Remove refrigerator
  • 2 new kitchen blinds
  • 1 new blind small curtain in master bathroom
  • Paint outside trim around doors that were installed a year ago.
  • Pressure wash house, sidewalks, and carport.
  • Restore hardwoods. Under contract!!!
  • Replace dryer vent under house. (trenched)
  • Install quarter round on stairs painted quarter round
  • Make the under the sink in the main bathroom more attractive (hide water damage).
  • Clean under carport
  • Quarter round along some walls to cover hardwood flooring gaps. ( LR, hallway, master bedroom )
  • Clear house of items.
  • Cut two small trees down in backyard.
  • Added: Repaint quarter round in boys old bedrooms.
Keep Right On Prepping - K






2 comments:

  1. Looking good!!! Can't let it sit unproductive any longer than you have to.

    ReplyDelete